This checklist about Plain Cement Concrete (PCC) lists out points to take care of such as formwork, pouring, curing etc. during PCC work.
| Sr | Check Item | Done |
| 1 | Check surface preparation. | |
| 2 | Check marking and levels to be done with respect to drawing. | |
| 3 | Check for form work. | |
| 4 | Check for finished level. | |
| 5 | Check for mixing of cement, sand and aggregate and adequate material. | |
| 6 | Check for pouring height. | |
| 7 | Do not allow extra cement mortar on top of PCC for smooth finishing. | |
| 8 | Check for aggregate test report (Fine aggregates / Cement / Water) | |
| 9 | Check for ramming with proper tools. | |
| 10 | Check for button marking for PCC thickness. | |
| 11 | Check for curing at least 7 days. |